Uptime and downtime calculator

Turn an SLA percentage into the downtime it allows per day, week, month, quarter and year. Check an outage against the target, combine the SLAs in your stack and see if a miss earned a credit.

  • Calendar-exact months
  • Business-hours SLAs
  • Link, copy, print, embed

Calculator

SLA % to downtime

The availability your contract or SLO commits to. Type 99.9, 99.95% or even "four nines".

99.9% (three nines)

Result

Allowed downtime per month

At 99.9% uptime, an average month (30.44 days) allows 43m 50s of downtime.

three nines

At 99.9% uptime, an average month (30.44 days) allows 43m 50s of downtime.

Per day
1m 26sof 1 day
Per week
10m 5sof 7 days
Per quarter
2h 11m 29sof 91.31 days
Per year
8h 45m 58sof 365.25 days

That's 1m 26s a day, 10m 5s a week, 2h 11m 29s a quarter and 8h 45m 58s a year.

One more nine (99.99%) cuts that to 4m 23s. One fewer (99%) allows 7h 18m 18s.

The nines table

Allowed downtime for every SLA level

Each extra nine cuts the downtime budget by a factor of ten. The table follows the month length and service hours you set above. Select a row to load it into the calculator.

Average month of 30.44 days and year of 365.25 days, measured 24 × 7.
UptimePer dayPer weekPer monthPer quarterPer year
2h 24m16h 48m3d 1h 3m9d 3h 9m36d 12h 36m
1h 12m8h 24m1d 12h 32m4d 13h 35m18d 6h 18m
28m 48s3h 21m 36s14h 36m 36s1d 19h 50m7d 7h 19m
14m 24s1h 40m 48s7h 18m 18s21h 54m 54s3d 15h 40m
7m 12s50m 24s3h 39m 9s10h 57m 27s1d 19h 50m
2m 53s20m 10s1h 27m 40s4h 22m 59s17h 31m 55s
1m 26s10m 5s43m 50s2h 11m 29s8h 45m 58s
43.2s5m 2s21m 55s1h 5m 45s4h 22m 59s
8.6s1m4m 23s13m 9s52m 36s
4.3s30.2s2m 11s6m 34s26m 18s
864ms6s26.3s1m 19s5m 16s
86ms605ms2.6s7.9s31.6s

Each step down is ten times less time

Allowed downtime per month on a logarithmic scale.

Month length

Why uptime calculators give different answers

There is no single length for "a month". Some tools use 30 days, some an average of 30.44 days (365.25 ÷ 12) and a few 30.42 days (365 ÷ 12). Your contract almost always means the calendar month, which runs from 28 to 31 days.

At 99.9%, that moves the budget from 40m 19s in a non-leap February to 44m 38s in a 31-day month: more than four minutes' difference for the same SLA. When a vendor reports 99.9% for February, it had less room than you might think.

  • Years have 365 days, or 366 in a leap year. Averages use 365.25.
  • Quarters run from 90 to 92 calendar days.
  • Days and weeks never change: 86,400 and 604,800 seconds.
  • SRE teams often use a rolling 28 days, so every window has four of each weekday.
Allowed downtime for the same SLA under five month lengths. 4m 19s between the shortest and longest month
  • 40m 19s
  • 41m 46s
  • 43m 12s
  • 43m 50s
  • 44m 38s

4m 19s between the shortest and longest month

Allowed downtime by month length
Month lengthAllowed downtime
Feb (28 days)40m 19s
Leap Feb (29)41m 46s
30-day month43m 12s
Average (30.44)43m 50s
31-day month44m 38s

SLA credits

A missed target is money you can claim

An SLA's percentage is the promise; its credit table is what the promise is worth. When monthly uptime drops below the target, most cloud and SaaS contracts give a credit of 10% to 100% of that month's fee. The catch: you usually have to notice the breach, gather evidence and claim inside a short window, often 30 to 60 days. Many teams never do.

  • AWS EC2, region level (99.99%)

    below 99.99% earns 10%, below 99.0% earns 30%, below 95.0% earns 100% of the monthly bill. Claim by the end of the second billing cycle after the incident.

  • Microsoft 365 services such as Exchange Online (99.9%)

    below 99.9% earns 25%, below 99% earns 50%, below 95% earns 100%.

  • Google Cloud

    only whole minutes of downtime count, and you must notify support within 60 days, with logs.

Vendor terms as published in November 2026. They change; check the current SLA.

Read: how to claim SLA service credits before the window closes

Method

How the calculation works

Five formulas cover every mode. Each one is checked against the examples below.

Allowed downtime

Allowed downtime = Measured time × (100 − SLA %) ÷ 100

An average month is 30.4375 × 86,400 = 2,629,800 seconds. At 99.9%: 2,629,800 × 0.1 ÷ 100 = 2,629.8 seconds, or 43 minutes 50 seconds.

Allowed downtime
The time the service may be down without missing the target.
Measured time
The length of the period, in seconds, inside service hours.
SLA %
The uptime target, in percentage points.

Uptime from an outage

Uptime % = (Measured time − Downtime) ÷ Measured time × 100

One hour down in an average month: (2,629,800 − 3,600) ÷ 2,629,800 × 100 = 99.863%.

Uptime %
Achieved availability. The calculator truncates it, so a result never rounds up into compliance.
Downtime
Total time the service was unavailable, in seconds.

When the contract excludes time

Uptime % = (Period − Excluded − Counted downtime) ÷ (Period − Excluded) × 100

In a 30-day month with 3 hours down, 2 of them in an excluded maintenance window: (2,584,800 − 3,600) ÷ 2,584,800 × 100 = 99.86%. Count all 3 hours and it's 99.583%.

Excluded
Time the contract says doesn't count, such as announced maintenance.
Counted downtime
Downtime left after the excluded time is taken out.

Several services in a row, or side by side

A = A₁ × A₂ × … × Aₙ

Services in series: all must be up.

A = 1 − (1 − a)ᵏ

Redundant copies: the service is down only when all k copies are. Three 99.9% services in a row: 0.999 × 0.999 × 0.999 = 99.7%. Two 99.9% copies side by side: 1 − 0.001² = 99.9999%.

A
Combined availability, as a fraction.
a
Availability of one copy, as a fraction.
k
Number of identical copies where any one can take the traffic.

Error budget and burn rate

Budget = (100 − SLO %) ÷ 100 × Window

Burn rate = Share of budget used ÷ Share of window gone

A burn rate of 1 lands exactly on budget. 20 minutes used by day 10 of an average month at 99.9%: 46% of the budget in 33% of the month, a burn rate of 1.39×. At that pace the month ends near 1h 0m 53s, over the 43m 50s budget.

SLO %
Your internal reliability objective.
Window
The period the budget covers, such as 28 days.
Burn rate
How fast the budget is being spent. Above 1, you run out early.

What the calculator assumes

  • Downtime is counted to the second. Many contracts count whole minutes only, and some ignore incidents shorter than a minute.
  • Service runs 24 × 7 unless you set service hours. Downtime outside service hours does not count.
  • Calendar months, quarters and years are measured in UTC. If your contract uses local time, a month with a daylight-saving change is one hour longer or shorter.
  • "Average month" is 365.25 ÷ 12 = 30.4375 days. "30-day month" pairs with a 365-day year and a 91.25-day quarter.
  • Combined figures assume components fail independently and failover is instant. Shared regions, networks and deploys make real-world numbers lower.
  • Burn-rate projections assume downtime keeps arriving at the same average pace.

Worked example

Worked example: a March with two outages

Every figure below is computed by the same code as the calculator.

Hosted services agreement

Schedule 4 · Service levels

a March with two outages

A supplier promises 99.9% monthly availability for a hosted service, measured around the clock over the calendar month. In March (31 days) there were two outages: 25 minutes on the 4th and 31 minutes on the 19th. A 2-hour maintenance window was announced in advance, and the contract excludes it.

Target
99.9% a month
Month
March 2027 (31 days)
Outages
25 + 31 min
Excluded
2 hours
Monthly fee
$20,000
Credit below target
5%
  1. 1Measured time, less excluded time31 × 24 × 60 − 12044,520 min
  2. 2Counted downtime25 + 3156 min
  3. 3Uptime(44,520 − 56) ÷ 44,520 × 10099.874%
  4. 4Allowed at 99.9%44,520 × 0.001 = 44.52 min44m 31s
  5. 5Over the allowance56 min − 44.52 min11m 29s
  6. 6Credit at 5%$20,000 × 5%$1,000

Target missed by 0.026 points

Credit due: $1,000

Claim it inside the notice window. Credits are rarely paid automatically.

Schedule 4 · Service levels

Hosted services agreement

The Supplier shall ensure the Service is Available for at least 99.9% of each calendar month, measured in whole minutes and excluding Planned Maintenance notified at least 5 Business Days in advance. If Availability falls below this level, the Customer may claim a credit of 5% of the monthly Charges, provided the claim is made within 30 days of the end of the month.

ObligaAI reads

Each calendar month needs 99.9% availability, counted in whole minutes, after removing maintenance announced five business days ahead. A miss earns 5% of that month's charges, but only if you claim within 30 days.

Target
99.9% per calendar month
Measured
whole minutes, 24 × 7
Excluded
planned maintenance with 5 business days' notice
Claim by
30 days after month end

The fine print

What the percentage leaves out: how contracts define downtime

Two contracts can both say 99.9% and promise very different things. The number only means something next to the definitions around it. These are the five that decide whether an outage counts.

What counts as down

Most cloud SLAs count whole minutes. AWS measures the share of minutes in the month that EC2 was unavailable; Google Cloud only counts a "downtime period" of one or more consecutive minutes, so a 50-second blip doesn't count at all. Some contracts measure error rates instead of time. If monitoring checks every five minutes, a four-minute outage may never show up.

What the SLA covers

A headline figure often applies to one deployment pattern. AWS's 99.99% EC2 commitment covers instances spread across two or more availability zones, and only when all of them are unreachable at once; a single instance gets 99.5%. Microsoft measures each online service separately, so minutes lost in Teams don't count towards an Exchange claim. Some SLAs, Slack's for example, have measured per quarter rather than per month.

What is excluded

Announced maintenance, force majeure, problems on your side of the network and anything you caused are usually carved out. Exclusions shrink the downtime that counts, and often the period it's measured against. Check how much notice maintenance needs and whether it's capped; emergency maintenance usually still counts.

Whose numbers count

Usually the vendor's. Their monitoring decides whether the target was met, and their status page may round or group incidents. Keep your own evidence: timestamps, monitoring logs and ticket references.

How and when to claim

Credits are rarely automatic. AWS wants the claim by the end of the second billing cycle after the incident; Google Cloud within 60 days; Microsoft within one or two months depending on the service. Incomplete claims can be refused.

ObligaAI reads these definitions in every SLA you hold, so a breach is checked against the contract's own rules, not a generic percentage. See supplier leakage.

Combined availability

Why your stack is less available than its parts

A service is only up when everything it depends on is up. Put three 99.9% services in a row (a load balancer, an app and a database) and the chance that all three are up together is 0.999 × 0.999 × 0.999 = 99.7%. That's about 2h 11m of downtime in an average month, three times what any one of them allows.

Redundancy works the other way. Two independent copies of a 99.9% service, where either can take the traffic, are only down when both are: 1 − 0.001 × 0.001 = 99.9999%. In practice copies share regions, networks, configuration and deploys, so they fail together more often than the maths assumes. Treat the parallel figure as a ceiling.

Working backwards helps when you negotiate. To promise 99.9% across three dependencies in series, each one needs about 99.967%. If a supplier offers less, the gap is yours to absorb, or to price into the contract.

Three 99.9% services in a row

99.7%

Error budgets

The downtime you're allowed to spend

Site reliability engineers turn the target around. If the objective is 99.9%, the other 0.1% is an error budget: time the service may be down without breaking the promise. Over Google's recommended 28-day rolling window, 99.9% gives 40m 19s.

Teams spend the budget on purpose (releases, migrations, experiments) and slow down when it runs low. The burn rate tells you how fast it's going: 1× lands exactly on budget at the end of the window, 2× runs out halfway through.

Set internal objectives tighter than the SLA you sign. If your SLO is 99.95% and the contract says 99.9%, you hear the alarm well before you owe anyone a credit.

99.9% over a 28-day window

40m 19s

Choosing a target

What each extra nine costs

A higher figure is only worth paying for if you can check it. Monitoring that checks once a minute can't prove a target that allows 26 seconds a month. For business-hours services, an SLA measured during service hours can be stricter in practice than a 24 × 7 one with a higher number. Renewal is the moment to fix weak SLA terms.

  1. 99%7h 18m 18s a month

    Fine for internal tools and batch systems. A bad afternoon fits inside it.

  2. 99.9%43m 50s a month

    The common SaaS commitment, and Microsoft 365's. One slow incident a month uses it up.

  3. 99.99%4m 23s a month

    Needs redundancy across zones and automated failover. No one is paged and fixing things in four minutes.

  4. 99.999%26.3s a month

    Only reachable with fully automated recovery. Few contracts offer it, and fewer meet it.

FAQ

Questions, answered.

How much downtime is 99.9% uptime?

43 minutes 50 seconds in an average month of 30.44 days, 43m 12s in a 30-day month and 44m 38s in a 31-day month. Per year it's 8h 45m 58s on a 365.25-day average, or 8h 45m 36s in a 365-day year. Per day it's 1m 26s.

How much downtime does 99.99% uptime allow?

About 4 minutes 23 seconds in an average month, 52m 36s a year and 8.6 seconds a day. That's ten times less than 99.9%.

What does five nines (99.999%) mean?

Five nines allows about 26.3 seconds of downtime in an average month and 5 minutes 16 seconds a year. At that level no person can respond in time, so it depends on fully automated failover.

How do you calculate uptime percentage?

Take the time in the period, subtract the downtime, divide by the time in the period and multiply by 100. One hour down in an average month (2,629,800 seconds) gives (2,629,800 − 3,600) ÷ 2,629,800 × 100 = 99.863%.

Why do uptime calculators show different numbers for the same SLA?

They assume different month lengths: 30 days, an average of 30.44 days or 30.42 days. Contracts usually measure the calendar month, which runs from 28 to 31 days, so the real budget changes every month. This calculator shows all of them and lets you pick a specific month.

Does planned maintenance count as downtime?

It depends on the contract. Most SLAs exclude maintenance that was announced in advance, often with a minimum notice period or a monthly cap, and still count emergency maintenance. Use the exclusions option in Check an outage to see both figures.

How do you calculate a composite SLA?

Multiply the availabilities of services that depend on each other: 99.95% × 99.99% = 99.94%. For redundant copies where any one can serve, use 1 − (1 − a)ᵏ: two 99.9% copies give 99.9999%. The Combined SLA tab does both.

What is an error budget?

It's 100% minus your reliability target, over a set window. At 99.9% over a 28-day window, the budget is 40 minutes 19 seconds of downtime. Teams spend it on releases and changes, and slow down when it runs low.

What happens if a vendor misses its uptime SLA?

Usually you're owed a service credit, a percentage of that period's fee, and the credit is often your only remedy. You normally have to claim it within a deadline (AWS: by the end of the second billing cycle; Google Cloud: 60 days) with evidence. Our SLA credit calculator works out the amount.

Is 100% uptime possible?

Not in practice. Hardware, networks and people all fail eventually, and planned changes carry risk. A contract can promise 100%, but that only means a credit is due for any downtime; it doesn't stop the downtime.

Your contracts already say what downtime costs the vendor.

ObligaAI reads the SLA schedules in your contracts, compares them with service reports and flags the credits you've earned, with the clause and the claim deadline attached.

Free to start, no credit card.

Sources

  1. 01Amazon EC2 Service Level Agreement · Amazon Web ServicesMonthly Uptime Percentage, credit tiers and the claim window.
  2. 02Compute Engine Service Level Agreement · Google CloudDowntime periods of one or more consecutive minutes; 60-day notice.
  3. 03Service Level Agreements for Online Services · Microsoft LicensingPer-service uptime and credit tiers.
  4. 04Reliability metrics: composite SLOs and SLAs · Microsoft Azure Well-Architected FrameworkSeries and parallel availability, SLA versus SLO.
  5. 05Implementing SLOs · Google SRE WorkbookError budgets and the 28-day rolling window.
  6. 06Availability management: ITIL 4 practice guide · AXELOSAvailability as agreed service time minus downtime.
  7. 07SLA time calculator · HyperpingA comparison point for month-length conventions.

This calculator gives general estimates for information only. It isn't legal, financial or engineering advice. Your contract's definitions of availability, measurement period, exclusions and credits decide what you're owed; read them, or let ObligaAI read them, before relying on any figure. Vendor terms quoted were checked in November 2026 and can change.Last reviewed 20 Nov 2026